Potential 'Gotchas' in an 85 MHz Return Path

Potential 'Gotchas' in an 85 MHz Return Path Carol Ansley, ARRIS

Changing an HFC network from a 42 MHz split to an 85 MHz split presents significant challenges in the home and local access network. These challenges result from the dramatic change in RF level experienced in the home and network as the frequency band shifts from downstream to upstream usage. However, new strategies are emerging to allow the shift to an 85 MHz split without requiring a wholesale upgrade of in-home equipment.

Why is there an issue?

Ideally, the change of the HFC frequency split would not cause any issues. But, the tuners within set-top boxes, cable modems and cable-ready TV sets are not perfect. The presence of significant energy in their originally designed reception band even outside of the nominal tuned channel can cause distortions due to automatic gain control (AGC) circuitry.

An AGC circuit exists to protect a device's internal tuner from too much energy in the incoming signal and to boost the signal when it is too low. Many AGC circuits integrate the power received over a wide bandwidth, not just the narrow channel currently desired, and adjust the level into the tuner accordingly. When the AGC circuit detects that the incoming signal power is too high, it will attenuate the signal to protect the tuner. Harmonic distortion or similar issues caused by a powerful upstream signal above 54 MHz in the tuner may also contribute to the problem.

The upstream transmit signal from an 85 MHz cable modem is potentially quite powerful. Therefore, the transmitted signal will generate reflections within each splitter that it crosses. That reflected energy travels back through the rest of the home network and can cause a device's AGC circuit to attenuate the entire downstream signal and create video problems.

The problem of unexpected reflected energy in the downstream tuner's receive band is not limited to the home where a new 85 MHz modem is deployed. When a signal is sent from one home into a port on a tap, reflections are generated in the splitter circuitry within the tap. Therefore, another home that shares a tap's internal splitter can receive a high level of reflected energy. In testing, reflections with as little as 24 dB of loss were seen.

Diagnosing 85 MHz related issues in the field

Problems caused by AGC overload due to upstream transmissions below 85 MHz tend to be intermittent, showing up only when the new modem is transmitting. A report of occasional video breakups can have many possible causes, and 85 MHz reflections add yet another.

Further complicating the diagnosis, subscribers are likely to be watching television at the same time that others in their home or neighborhood are using high-speed data services. If a reflected signal issue exists, it may be seen in the evening, but may disappear the following morning. A technician who arrives at the home may not see any video degradation and, unless trained to also look for 85 MHz modem issues, may dismiss the problem as a temporary interruption in the plant.

Preventing 85 MHz related issues

Several alternatives exist to remediate a home where a new 85 MHz modem has been installed; the sensitive CPE devices can be protected individually or addressed by remediating the home overall.

One approach to preventing in-home issues is to use a two-port cable modem for 85 MHz deployments, where one port addresses the HFC network and the other port addresses the home network. Using this device eliminates the possibility of interference in the home by directing all 85 MHz upstream transmissions directly onto the HFC network.

Alternatively, if a traditional single-port modem configuration is used, then filters that block signals between 42 MHz and 85 MHz should be added to each set-top box or other cable receiving device or alternatively to a splitter port leg to protect multiple devices. The additional filtering helps prevent reflections in the 42-85 MHz band from reaching the other ports used for the home.

Preventing issues in the local access network

A more challenging situation is present if the operations department determines that some tap ports do not have limited port-to-port isolation and therefore may pass 85 MHz energy from one port to another. One option is to direct installers to place bandpass filters on other ports of a tap potentially affected when the new modem is installed.

Another possibility is to replace the tap faceplate or even the entire tap as a part of the 85 MHz plant upgrade. This solution can help prevent 85 MHz crosstalk and makes the most sense if the tap is to be replaced as part of a 1.2 GHz downstream upgrade.

Advance deployment of 85 MHz modems before plant upgrades

Some MSOs are considering deploying 85 MHz modems ahead of planned 85 MHz plant upgrades while continuing to use the 54-85 MHz frequency band for downstream services. Unfortunately, problems can be caused by an 85 MHz modem even when it operates below 42 MHz if it does not have a built-in switchable filter. Testing indicates that at least some digital-to-analog converters (DACs) used for modem transmitters have a noise floor that pops up during transmissions. The levels seen were fairly low, but may cause distortion to analog video signals in the 54-85 MHz band. To avoid this problem, service providers can deploy a device with a built-in switchable filter.


Consumer demand for upstream bandwidth is increasing, causing service providers to evaluate new methods of delivering it. The latest DOCSIS standards provide support for upstream operation above the current operating 5 to 42 MHz or 5 to 65MHz bands. Successful expansion of the upstream band requires that actions be taken to prevent problems with legacy equipment already deployed in the field.

A two-port cable modem or gateway provides the most operationally friendly option, but other options can also provide acceptable performance. Improving the port-to-port loss in splitters in the home as well as within taps supporting homes with new 85 MHz modems can prevent problems from showing up after the new modems are deployed.

Carol Ansley is Senior Director, CTO Office, for ARRIS.

Get the Broadband Technology Report Newsletters Delivered to Your Inbox

Subscribe to email newsletters today at no cost and receive the latest information on:

  • Video Technology
  • Network Technology
  • Technology Alerts
  • BTR LATAM (Latin America)

SCTE-Cable Tec Expo 2016 Video Show Dailies

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 3

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 3

In our Video Show Daily for Day 3 of exhibits at SCTE Cable-Tec Expo in Philadelphia, BTR Editorial Director Stephen Hardy covers trends in distrib...

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 2

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 2

In our Video Show Daily for the second day of exhibits at SCTE Cable-Tec Expo in Philadelphia, BTR Editorial Director Stephen Hardy highlights furt...

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 1

BTR's SCTE-Cable Tec Expo Video Show Daily, Day 1

BTR Editorial Director Stephen Hardy reviews the hot technologies and announcements from the first day of exhibits at SCTE Cable-Tec Expo 2016 in P...

Diamond Technology Reviews - 2016 High Scores

2016 Diamond Technology Reviews Slideshow

2016 Diamond Technology Reviews Slideshow

Diamond Technology Reviews 2016

Diamond Technology Reviews 2016

BTR's Diamond Technology Reviews, now in its twelfth year, is a technology recognition program wherein vendors serving the broadband cable ...

Related Articles

Cable ONE

2 More AZ Towns Get Cable ONE Gigabit

October 7, 2016

Cable ONE (NYSE:CABO) is expanding its GigaONE gigabit Internet footprin...


Comcast Launches Enterprise IoT Trial

October 6, 2016

Comcast (NASDAQ:CMCSA) announced machineQ, a business trial venture focu...


2016 SCTE Cable-Tec Expo Wrap Up

Whether you couldn't make it to Cable-Tec this year or want to see if you missed anything while you were there, you'll want to join BTR editors Stephen Hardy and Ron Hendrickson as they reveal their picks for the...

October 12, 2016
Sponsored by

Counting the cost: Efficiently transitioning from HFC to FTTH

HFC networks are uniquely positioned to provide compelling and competitive services, and are also uniquely positioned to transition to symmetrical FTTH as commercial requirements demand.  This webinar will d...

Date:September 22, 2016
Sponsored by

Maintaining High Quality of Experience in an Adaptive Bitrate System

This webinar will look at the many points in an ABR system where the video is touched.  From ingest (satellite, file, and IP), to egress, each point should be qualified for compliance to help maintain a high...

Date:August 25, 2016
Sponsored by

White Papers & Special Reports

Cable VoIP 2.0: Voice Moves to the Cloud

October 2016

Cable providers led the charge on the VoIP evolution and won customers and market share. Now voice networks are evolving again. The cloud voice platform has ...

Understanding Ultra High Definition Television

October 2016

Over the last 10 years, high definition television (HDTV) has been replacing standard definition television as the expected viewing format for television pro...

Are You Ready for DOCSIS 3.1? The Future of Cable Technology and How to Prepare Your Network

October 2016

DOCSIS 3.1 promises 10x capacity throughput and a range of technical benefits for cable providers and users alike. Are you ready? Discover the technical adva...

BTR Blogs

BTR Managing Editor Ron Hendrickson

FCC Rethinks Set-Top Plan

September 10, 2016

By Ron Hendrickson - The FCC has reworked the "unlock the set-top b...


In Memoriam: Richard Covell

August 18, 2016

By Rob Stuehrk, Publisher - We at Broadband Technology Report were sadde...

BTR Managing Editor Ron Hendrickson

Court Overturns FCC Municipal Broadband Order

August 11, 2016

By Ron Hendrickson - You win some, and you lose some, and the FCC just l...

Featured Hangouts

4K 4 U: How to Prepare for UltraHD Video

4K 4 U: How to Prepare for UltraHD Video

4K/UltraHD video is coming - consumers are buying the TV sets, and more content is becoming available. Watch this inf...

DOCSIS 3.1: A Look Ahead

DOCSIS 3.1: A Look Ahead

Watch a 30-minute video chat of experts from a variety of related disciplines discuss how close deployments really ar...

Featured Hangout

4K 4 U: How to Prepare for UltraHD Video

4K/UltraHD video is coming - consumers are buying the TV sets, and more content is becoming available. Watch this informative Hangout on demand by clicking the link above.

Sponsored by Verimatrix.